At Elgar Services, we undertake a wide range of commercial heating projects, from routine maintenance and repairs to complete plant room upgrades.
We recently completed a substantial commercial plant room upgrade in Stratford-upon-Avon, replacing ageing heating and hot water equipment with a modern, more reliable system.
The project was carefully planned and delivered across two phases, allowing our engineers to complete each stage efficiently while preparing the plant room for its new equipment.
Phase 1: Commercial Boiler Replacement & Plant Room Preparation
The first phase focused on upgrading the existing commercial heating system.
Our engineers replaced the existing 85kW boilers with new Worcester Bosch 7000WP boilers, installed on a purpose-built mounting frame, complete with all associated pipework.
Once the new boilers had been installed and integrated into the existing heating system, attention turned to the hot water equipment.
The existing cylinder had developed a split internal coil, making replacement necessary. Our team drained down the system before safely removing the faulty cylinder and its associated pipework.
With the old equipment removed, further preparation works could begin. The cellar was professionally tanked and new flooring installed, creating a suitable space for the next stage of the installation.
See photos below for the first phase...
Phase 2: Commercial Hot Water System Installation
With the new boilers in place and the plant room prepared, the second phase focused on upgrading the building's hot water provision.
Our engineers installed two 300-litre Cyclone pressurised cylinders alongside a 450-litre Power Tank, completing the next stage of the plant room transformation.
This involved careful planning and coordination to ensure the new equipment could be accommodated within the available space and integrated with the upgraded heating system.
The completed installation provides a modernised heating and hot water setup, designed to support the demands of a commercial property.
Photos of phase 2 below...
A Complete Commercial Plant Room Transformation
Commercial plant room upgrades require detailed planning, technical knowledge and experienced engineers, particularly when working with existing systems and larger heating installations.
From replacing the boilers and removing faulty equipment to preparing the cellar and installing the new hot water system, this was a substantial project for the Elgar Services team.
The finished plant room is a fantastic transformation and another example of the commercial heating projects our engineers can undertake.
Commercial Heating & Plant Room Upgrades in Worcestershire and Warwickshire
At Elgar Services, we provide professional commercial heating and plumbing services for businesses and commercial properties across Worcester, Worcestershire, Stratford-upon-Avon, Warwickshire and the surrounding areas.
Whether you're planning a complete plant room refurbishment, replacing commercial boilers or upgrading your existing heating and hot water systems, our experienced engineers can help.
Planning a commercial heating project?
Get in touch with Elgar Services to discuss your requirements.
Call: 01905 604417
Website: www.elgarservices.co.uk
Recent Comments